INDUSTRY GUIDE
zoeken | portals | berichten | aanmelden | login
K. Mekky
The film was shot on a windy day and with just a boom, so NO wireless. it required a lot of audio editing to smoothen the image cuts,as well background noise and wind reduction. It was made for the 48H film project. The audio post production was done within 4.5 hours.